09/06/2017 / Case Studies
Epsilon Packaged Mechanical Plant for Holy Cross Hospital
The Challenge Hospitals are heavily regulated in terms of their size, total number of beds, the services they can provide,...
Read More
02/15/2017 / Case Studies
GM T1 Project – Chilled Water Plants
When General Motors and their contractor Barton Malow needed three 7,500 Ton Chilled Water Plants for expansions at the GM plants...
Read More
08/20/2010 / Case Studies
AVL America, GM Powertrain Prove Out Center
Climate Technologies has delivered a 650 horsepower -40F M&M Refrigeration chiller and low temperature secondary fluid pumping package to AVL...
Read More