03/28/2018 / Case Studies
Lower Energy and Maintenance Costs with ARP Humidification Systems
Case Study: ARP Humidification System Grand Valley State University, Cook-DeVos Center for Health SciencesGrand Rapids, Michigan LocatedĀ in the heart of Grand...
Read More
09/06/2017 / Case Studies
Epsilon Packaged Mechanical Plant for Holy Cross Hospital
The Challenge Hospitals are heavily regulated in terms of their size, total number of beds, the services they can provide,...
Read More
02/15/2017 / Case Studies
GM M5 Project – Chilled Water Plants
When General Motors and their contractor Barton Malow needed three 7,500 Ton Chilled Water Plants for expansions at the GM plants...
Read More
06/16/2012 / Case Studies
Scotch Marine Boilers Delivered to Robert Bosch Corp
Two Scotch Marine boilers were delivered to the Robert Bosch Corporation building in Farmington Hills, MI. Climate Technologies worked in...
Read More
08/20/2010 / Case Studies
AVL America, GM Powertrain Prove Out Center
Climate Technologies has delivered a 650 horsepower -40F M&M Refrigeration chiller and low temperature secondary fluid pumping package to AVL...
Read More